Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: updated language

...

Check the Enable enhanced synchronization box to use a player synchronization scheme similar to the BrightWall™ feature. When this feature is enabled, interactive presentations using Synchronize events can be easily linked by a masterleader/slave follower scheme: The presentation sending a Synchronize command acts as the masterleader, while the presentation(s) using Synchronize events act as slavesfollowers. Synchronize events associated with slave follower presentations will trigger within a few milliseconds of the Synchronize command associated with the master leader presentation.

  • Master: Select this option to have the presentation send Synchronize commands. A master/leader presentation cannot contain Synchronize events (i.e. you cannot chain one master leader presentation to another).
  • Slave: Select this option to have the presentation receive Synchronize commands (via Synchronize events).
  • Domain: Enter a domain number between 0 and 127. This number needs to be unique for each set of masterleader/slave follower presentations on the local network. This will ensure that multiple groups of synchronized presentations can operate on the same local network without synchronization messages interfering with each other.

...