Expand | ||
---|---|---|
| ||
Try the following:
If the problem still exists, try to duplicate it and then exit BrightAuthor if it’s open. Locate the eventlog.txt file and forward it to support@brightsign.biz, along with a description of the problem. |
Why doesn’t my schedule work if I use multiple projects?
Expand | ||
---|---|---|
| ||
If scheduling one presentation to play all the time works but setting multiple presentations to play at different times of the day fails, the problem is likely caused by the date, time, or timezone setting on your player. To support day parting, the player needs to be connected to a network with a time server or needs to have a manually configured time:
The LS424 has a real-time clock (RTC) but does not have a supercapacitor to save the configured time after it power cycles. This player model must be able to communicate with a time server to play day-parted presentations reliably. |