...
title | Table of Contents |
---|
Table of Contents | ||||
---|---|---|---|---|
|
Overview
The Link Synchronize advanced command and Synchronization Event are used in BrightAuthor:connected to synchronize playback across zones in a single player or between players, and using these two together establishes a leader/follower relationship between those zones.
...
As of BrightAuthor:connected 1.19.3 and BOS 9.0.101, you no longer need to use Link Zones (Jam sync) to synchronize presentation zones on a player. Instead, when you want to synchronize zones, use Link Synchronization and it’s follower component called the Synchronization Event. This method only uses software synchronization, not hardware (clock) synchronization.
...